Holt Mill
The Holt Mill was constructed in 1988, originally designed for a throughput of 1,360 tpd. Expansions in 1988 and 2001 increased the throughput to 2,500 tpd and 3,000 tpd respectively. Surface ore storage totals 4,900 tonnes in three silos. There is a grinding circuit, two cyclone cluster circuits, a thickener, and a Carbon-in-Leach (CIL) circuit within the plant facilities.



Precious metal stripping is performed in batch. Carbon is transferred to an adsorption column where a Zadra process is utilized as the gold elution method. Barren solution is circulated through two shell and tube heat exchangers and a 360 kW electric inline heater. The resulting pregnant solution is pumped from the solution tank to an electrowinning cell. The gold precipitate is further refined using a 125 kW inductotherm furnace.

The Holt Mill was re-commissioned in September 2009, ahead of production from the Holloway Mine as the Company entered into a custom milling agreement with a nearby producer. Since such time, ore from Holloway, Hislop and now the Holt Mine is being shipped to the mill for processing, and the mill is at full capacity.



 
Operations
Subscribe to Updates